With the drywall in place, the radiant floor goes down and we’re almost ready for a finished floor on the second story. The Live/Work Blog follows the crew as they pour a layer of lightweight concrete (Gypcrete) to provide a matrix for the radiant system.
Continue Reading...
A big day at the Live/Work project in Portland – the siding is up, and windows and doors are in. Weather be damned!
Continue Reading...
Windows and doors arrive, and the “pretty in pink” house gets closer to being water-tight
Continue Reading...
The Live work project gets a roof, we start the electrical, and the outside gets a pretty-in-pink foam treatment.
Continue Reading...
These videos speak for themselves: watch as the walls go up on Portland’s Live/Work project!
Continue Reading...
The wood arrived on site and our crew sets about framing the “work” portion of the Live/Work building.
Continue Reading...
The crew from All American Concrete showed up in force today – complete with two trucks full of concrete, a heavy-duty pump, and enough trowels to fill a wheelbarrow.
Continue Reading...
1000 feet of PEX tubing went down yesterday; it’s the beginning of the radiant heat system
Continue Reading...
Pink Foam and rebar are set in place. Only a matter of days before we bring in concrete for the slab pour.
Continue Reading...
The crew arrives with a Bobcat and several thousand pounds of gravel to fill in under the future slab
Continue Reading...