Live/Work Update: Gypcrete

16 Mar 2010, Posted by Shawn in Live Work, Suppliers, 0 Comments

Live/Work Update: Gypcrete


With the drywall in place, the radiant floor goes down and we’re almost ready for a finished floor on the second story. The Live/Work Blog follows the crew as they pour a layer of lightweight concrete (Gypcrete) to provide a matrix for the radiant system.

Continue Reading...
Live/Work Video Update: Siding!

13 Feb 2010, Posted by Shawn in Live Work, Sustainability, 5 Comments

Live/Work Video Update: Siding!


A big day at the Live/Work project in Portland – the siding is up, and windows and doors are in. Weather be damned!

Continue Reading...
Live/Work Update: Exterior Trim

01 Feb 2010, Posted by Shawn in Live Work, 3 Comments

Live/Work Update: Exterior Trim


Windows and doors arrive, and the “pretty in pink” house gets closer to being water-tight

Continue Reading...
Live/Work Update: Roof, Electrical, Plumbing, House Wrap

07 Jan 2010, Posted by Shawn in Live Work, Sustainability, 6 Comments

Live/Work Update: Roof, Electrical, Plumbing, House Wrap


The Live work project gets a roof, we start the electrical, and the outside gets a pretty-in-pink foam treatment.

Continue Reading...
Live/Work Framing Videos

11 Dec 2009, Posted by Shawn in Contractors, Live Work, Video, 2 Comments

Live/Work Framing Videos


These videos speak for themselves: watch as the walls go up on Portland’s Live/Work project!

Continue Reading...
Live/Work Update: Framing!

07 Dec 2009, Posted by Shawn in Live Work, 3 Comments

Live/Work Update: Framing!


The wood arrived on site and our crew sets about framing the “work” portion of the Live/Work building.

Continue Reading...
Live/Work Update: Concrete Slab

26 Nov 2009, Posted by Shawn in Contractors, Live Work, 4 Comments

Live/Work Update: Concrete Slab


The crew from All American Concrete showed up in force today – complete with two trucks full of concrete, a heavy-duty pump, and enough trowels to fill a wheelbarrow.

Continue Reading...
Live/Work Update: Radiant Heat

25 Nov 2009, Posted by Shawn in Green, Live Work, Sustainability, 1 Comments

Live/Work Update: Radiant Heat


1000 feet of PEX tubing went down yesterday; it’s the beginning of the radiant heat system

Continue Reading...
Live/Work Update: Slab Insulation

21 Nov 2009, Posted by Shawn in Live Work, 5 Comments

Live/Work Update: Slab Insulation


Pink Foam and rebar are set in place. Only a matter of days before we bring in concrete for the slab pour.

Continue Reading...
Live/Work Update: Slab Back Fill

12 Nov 2009, Posted by Shawn in Contractors, Live Work, 2 Comments

Live/Work Update: Slab Back Fill


The crew arrives with a Bobcat and several thousand pounds of gravel to fill in under the future slab

Continue Reading...