13 Feb 2010, Posted by Shawn in Live Work, Sustainability, 5 Comments
Live/Work Video Update: Siding!
A big day at the Live/Work project in Portland – the siding is up, and windows and doors are in. Weather be damned!
Continue Reading...A big day at the Live/Work project in Portland – the siding is up, and windows and doors are in. Weather be damned!
Continue Reading...Windows and doors arrive, and the “pretty in pink” house gets closer to being water-tight
Continue Reading...The Live work project gets a roof, we start the electrical, and the outside gets a pretty-in-pink foam treatment.
Continue Reading...These videos speak for themselves: watch as the walls go up on Portland’s Live/Work project!
Continue Reading...The wood arrived on site and our crew sets about framing the “work” portion of the Live/Work building.
Continue Reading...The crew from All American Concrete showed up in force today – complete with two trucks full of concrete, a heavy-duty pump, and enough trowels to fill a wheelbarrow.
Continue Reading...1000 feet of PEX tubing went down yesterday; it’s the beginning of the radiant heat system
Continue Reading...Pink Foam and rebar are set in place. Only a matter of days before we bring in concrete for the slab pour.
Continue Reading...The crew arrives with a Bobcat and several thousand pounds of gravel to fill in under the future slab
Continue Reading...Concrete arrived at the Live.Work site today. Everything went exactly as planned – even the weather cooperated and blessed us with a rare sunny November day.
Continue Reading...