Live/Work Framing Videos

11 Dec 2009, Posted by Shawn in Contractors, Live Work, Video, 2 Comments, Short-URL:http://portlandbuilt.com/pyrwe

Live/Work Framing Videos


Here’s two new time-lapse videos showing framing over the course of 4 days. Hard to believe you can get all of the walls up in such a short period time.

Of course, there were a fair share of challenges in Portland this week. Namely, that we had some of the coldest weather in history. Temperatures in the teens and serious wind-chill made for a tough work environment. Air lines froze; couplings froze; compressors stopped working. Rory and the framers had to jury-rig enclosures for the compressor and fittings to keep them operational. We even brought in space heaters to warm up the tools…Rory seemed to get some perverse pleasure out of the fact that I was effectively heating the outdoors with 2 electric space heaters. Don’t even ask what my power bill will be.

Our weather troubles aside, the framing went remarkably well (with the exception of one poor fella who took a hammer in the nose). Our framing contractor, Santos, runs a good crew and all of the guys worked really hard morning to evening. I think the most impressive sight was watching this one guy pick up 6 2×4’s on his shoulder…even more impressive considering he wasn’t much taller than 5 feet.

The one bright spot in the weather has been the decided lack of precipitation. While it’s been cold, at least the dry weather has made for a reasonable work site. Once things thaw, we’ll be back to the mud pit. Forecasts call for freezing rain and snow this weekend.

Here’s a preview of the job site:Muddy Job Site

Related Posts

  1. Live/Work Update: Framing!
  2. Live/Work Video Update!
  3. Live/Work Groundbreaking!

2 Comments

December 13, 2009 7:42 pm

Patti

Wow! This is fun to watch! Thanks for the update. If I lived up there, I would bake your crews some of my famous cookies!

January 7, 2010 1:19 pm

Insulation on the Portland Live/Work Project | Portland Built

[...] been a busy month at the Live/Work project. After the guys at Bronze finished framing, we started in on roofing, plumbing, electrical, and the exterior house wrap. Let me just say that [...]

Posting your comment...

Leave A Comment


Subscribe to this comment via Email