Live/Work Update: Slab Back Fill

12 Nov 2009, Posted by Shawn in Contractors,Live Work, 2 Comments, Short-URL:http://portlandbuilt.com/07571

Live/Work Update: Slab Back Fill


The crew from All American was back today to back fill with rock. I was a little shocked to watch the guys build a mini ramp on which they drove the bobcat into the center of the building. Guess it beats the wheelbarrow!

The rain and bobcat made for a real mess. Check out the time-lapse video below to see how quickly the yard goes from solid ground to mud-soup (warning to slow-bandwidth viewers: the video is in high-def and takes some time to download. You can disable the HD by clicking the “HD” logo in the lower right corner of the player).