11 Nov 2009, Posted by Shawn in Contractors,Live Work, 2 Comments, Short-URL:http://portlandbuilt.com/87301
Live/Work Update: Stem Wall Pour
Today the guys from All American Concrete showed up in force. Kip, AAC’s owner, supervised the pour. Everything went off without a hitch. The truck showed up on time, the pump was ready to go, and the concrete flowed like sweet molasses. Ok, maybe thick oatmeal.

