Live/Work Update: Kitchen Installation
Well, the last few months have been a real grind at the Live/Work project. Mostly because I’ve elected to do most of the finish work myself, things have progressed very slowly. There are only so many things you can get done on nights and weekends. (Oh, and did I mention I’m not a professional cabinet builder, concrete contractor, or electrician?!?!)
The good news is that we can see the light at the end of the tunnel! It’s been almost a year, and the last few details are wrapping up – appliances are going in, cabinets are hung, and we’re looking forward to the final inspections. Yeah!
Here are a few (long overdue) photos from the last few months. Thanks for your patience – making time to keep up with Portland Built (while running Kinesis) has been nearly impossible. With the project wrapping up, we’re looking forward to putting more time into the Portland Built site. Enjoy the show!
Big thanks to everyone who helped with this phase of the project- especially to John Wallace, who put up with my attempts at cabinetry.









5 Comments
October 16, 2010 3:29 pm
Patti
wow and then more wow.
October 27 2010 01:06 am
Patti @Twitter Name
When is move in day?
October 22, 2010 4:15 pm
Kathy Mustard
Shawn, you have never ceased to amaze me. What a Renaisance Man!
October 22 2010 20:07 pm
Shawn
Stop it! You're making me blush :)
October 31, 2011 12:37 pm
Feinmman @Twitter Name
The stain is a really great color. In some of the photos it takes on a much more orange hue than others. I’m sure it looks great when the sun comes in.
Posting your comment...
Leave A Comment